Some of our projects in Algeria

Print this page   Send this page to a friend

Some of our projects in Algeria

2008

  • Design and construction supervision for the framework contract for SEAAL
  • Detailed design, technical assistance and construction supervision for the Est and Ouest water transfer systems supplying the upper plains of Sétif

2007

  • Ground-penetrating radar survey for the Oran sewer system evaluation study

2006

  • Assessment of the hydraulic structures of the Dzioua reservoir in Ain Temouchent
  • Supervision of construction of the conveyance system supplying the cities of Mila and Constantine from the Beni Haroun transfer system
  • Assessment of the sanitary and storm sewer systems of the city of Oran
  • Supervision of construction of the Sidi Merouane wastewater treatment plant

2005

  • Design review and works supervision for the Ouargla Valley sewerage and drainage project
  • Assessment and rehabilitation studies for the water supply systems of Sétif, Batna and El-Oued

2003

  • Northern Sahara - Northern Algeria water transfer feasibility study
  • Oran sewer system repair and refurbishment project

2002

  • Seawater desalination study for the Ministry of Water Resources