2004
- Technical assistance for construction of missing links on corridor Ixb in Lithuania
2003
- Preparation of feasibility study for the i package of the Nemunas Midland river basin master plan
2002
- ISPA road projects in Lithuania – Construction Supervision Corridors I, IA, IXB
- TA in LI0013 “Three Infrastructure Components at Lithuania’s Eastern Borders
2001
- Pre-feasibility Study for logistic Centre in Klaipeda
Return to the previous page