|
|
Recent projects
2010 - Technical studies in connection with the infrastructure, buildings and equipment for the new terminal of the Tanger Med container port
2008 - Supervision of the civil works for the Tanger container terminal development
- Assistance to the Project Management Unit for the Sébou river basin sanitation programme
2007 - Water and sanitation study for the city of Bata
- Design studies for the replacement of segments of the Oum Er R'bia transmission system
- Civil works and equipping of two reinforced concrete storage tanks in Dar Bouazza
2006 - Sewerage strategy for peri-urban settlements (douars) in the Greater Casablanca area
- Water supply and sewerage master plans for Greater Casablanca
- Hydraulic study of 10 pumping stations for the Mediterranea Saidia resort
2005 - Improvement of the sewage collection and pumping systems for the new Saâdia seaside resort
- Staff training needs study for RADEEO
- Strategy for the supply of water to rural parts of Greater Casablanca
- Casablanca sewer system improvement programme
Back
|
|